Your bijli bill,
₹4,200 a month.
Ab ₹0.
Rooftop solar, installed in 21 days with the subsidy paperwork handled end to end. Zero down payment on EMI — the monthly saving covers it.
Your own roof
1–10 kW on-grid with the subsidy. The calculator above is sized for this.
For societies & RWAsThe common-area bill
Pump, lift, corridor lights, CCTV — one shared bill, one shared saving.
For businessShops, factories, farms
Sized from a load study, not a bill. Free energy audit first.
Four things we put in writing
Solar is a 25-year purchase from a vendor you meet for three weeks. These are the commitments that survive the installation.
Generation guarantee
If your system produces less than the units we promised in the proposal, we pay you ₹8 for every unit short. Measured on the meter, settled every year.
Zero repair cost for 5 years
Inverter failure, cable damage, a cracked module after a hailstorm — parts and labour are ours. No annual maintenance contract to sign, no per-visit charge.
Subsidy filed by us, or it is free
National portal registration, DISCOM application, net-meter inspection and the subsidy claim are handled by our team. If your sanctioned subsidy does not land in 90 days of commissioning, we waive our installation fee.
You watch it on your phone
Live generation, units exported to the grid, and this month's saving — on an app, not a quarterly email. If output drops, our service team is alerted before you notice.
What we actually do
Full EPC — engineering, procurement and construction. One team from the feasibility survey to the day your net meter is sealed.
Rooftop solar — on-grid, off-grid, hybrid
On-grid for the subsidy and net metering. Off-grid where the supply is unreliable. Hybrid with battery backup where you need both. We size it to your load, not to a package.
Net metering, start to finish
UPNEDA and national portal registration, DISCOM feasibility application, inspection, meter installation and the subsidy claim. You sign; we file.
Operation & maintenance
Annual maintenance contracts, scheduled cleaning and servicing, and fault attendance. A solar plant that nobody maintains quietly loses a fifth of its output.
Consultation & energy audit
For businesses and industries: we measure your actual load profile before proposing a system, so you are not paying for capacity you will never use.
Homes and independent houses
Common-area loads
Shops, offices, hotels
Factories and warehouses
Pumps and farm loads
Societies: the bill nobody argues about
Your flats are metered individually, but the common area is one bill split across everyone — and it only goes up. That is the easiest solar decision an RWA will ever make.
Submersible pump
Water supply, running daily
Common lights
Every floor, every night
Lift
The single biggest common load
CCTV & security
24×7, never switched off
Put a system on the terrace, run the common area off it, and the society’s shared bill drops by 70–100% depending on how it is sized. One investment, benefit split across every flat, for twenty-five years. We handle the society resolution paperwork and the DISCOM application together.
Twenty-one days, four visits
You are involved on day one and day twenty-one. Everything between those is our paperwork.
Free roof survey
An engineer measures shadow-free area, checks your sanctioned load and photographs the meter board. You get a fixed-price proposal the same evening.
Paperwork and approval
We register you on the national portal, file the DISCOM feasibility application and arrange your loan sanction if you want EMI.
Installation
Mounting structure, modules, inverter and earthing go up in two working days. Our crew cleans the site before leaving.
Net meter and subsidy
DISCOM inspection, net-meter installation, commissioning certificate — then the subsidy claim goes in and lands in your bank account.
We are new. Here is why that is safe.
Ssarth GreenTech is a young company, and you should not have to take that on faith. So the risk sits with us, in writing, before you pay anything.
Nothing upfront before the proposal
The site survey is free and carries no obligation. You receive a written proposal with system size, fixed price, expected annual generation and your exact subsidy amount — and only then decide.
You pay in stages, against work done
Payment is milestone-based — on material delivery to your address, on installation, and on commissioning. You are never paying for work that has not happened yet.
Your warranty is the manufacturer’s, not ours
Modules and inverters carry warranties from the manufacturer and are honoured whatever happens to us. We hand you the serial numbers and warranty documents at commissioning — they are yours to claim on directly.
One named person, one number
You deal with the same person from survey to subsidy credit, on the number at the top of this page. No call centre, no ticket queue, no handover to someone who does not know your roof.
The questions everyone asks
The five that come up on every visit. All questions →
How much subsidy will I actually get?
Do I need to pay everything upfront?
What happens during monsoon and at night?
How much roof do I need?
What maintenance does it need?
Will it work if I am a tenant, or in an apartment?
Get call in minutes
An engineer calls you back on WhatsApp.